An optional performance exhaust will further alert those around the C63 Cabriolet to its potential. Depending on the transmission's mode, the exhaust has a flap that will automatically open to produce a more aggressive sound. Of course, it's not just the way the C63 Cabriolet sounds that will signify its performance.
In addition to its wider track, the C63 Cabriolet's wheel arches are flared 2. Also available is a set of carbon-ceramic brake rotors. Inside, the C63 Cabriolet gets the full AMG treatment with its own 3-spoke steering wheel, a mph speedometer plus sports seats. Swathed in "cashmere white magno" paint over saddle leather, the Edition 1s will be fully loaded. Mercedes says the C63 Cabriolet will hit the market by fall.
Pricing details should arrive closer to that date. We've already driven the C63 sedan and C63 Coupe, and can only imagine how much more fun the car will be with its roof down. To read about them and learn about other vehicles debuting in New York, head to our dedicated show hub.
New York Live Oct 8. New York Live Oct 1. New York Live Sep Flowers of the Week. What Our Hosts Are Wearing. More Lifestyle. Each dwelling unit is equipped with electric cooking equipment.
Each dwelling unit is fitted with either electric space heating, or air conditioning, or both. We are currently designing a residential high-rise and are in compliance with condition 1 and 2.
Electric Radiators and Heat Mats are not the primary form of heating, they are supplemental to the hermetic system. In qualifying for the optional calculation, the NEC does not specify whether electric space heating is supplemental or is the primary means of heating the space, just that it is permanent, and Electric Radiators and Heat Mats are referenced as Electric Space Heating. Can we use the Optional Method to calculate the load on a feeder in this case?
Yes, where the supplemental electrical heating is connected to the dwelling's electrical feeder electrical panels. Subsections PV disconnecting means is permitted to be connected to the supply side of service disconnect, Do we need a Safety switch fused or unfused outside the house for the solar system on the roof, If the system is connected on a back feed breaker in the main service panel of the house?
See answer to above. When installing solar system, do we need to install a jumper wire across water meter when the existing house water ground is in good condition? Where the grounding system is code compliant and not modified, it shall be permitted to remain. The PV disconnect is not a service disconnecting means. However in our case, the depth of counter space behind the ranger top is more than 12" hence we are considering this peninsula to be a single peninsular space and providing one outlet at the connecting edge of the peninsula as per section Please advise if one receptacle acceptable per the referenced code section and installation shown in the photos?
Two photographs have been attached for your review. At least one receptacle outlet is required, however, the receptacle shown in the photo is located more than 12" from the counter top and more than 6" of overhang. See Exception to If so, why would this be needed if the conductors are going to a main breaker?
A 2, Amp Service Switch is mounted next to it. Can service conductors pass though service equipment? Yes, where the service conductors are grouped together and the service switch has adequate gutter space in accordance with section Yes, where the installation complies with Then directly under it in J Non-Residential Use it says it is permitted in residential buildings over 3 stories unless prohibited elsewhere by other articles of this code.
That seems to point to PVC is allowed to be installed in buildings over 3 stories when provided with one hour thermal barrier. Sources include service entrance points, secondaries of different transformers, generators and UPS systems. This section is irrelevant to the question. PV source circuits and PV output circuits shall not be installed in the same raceway, cable tray, cables etc. It took many months for them to change the wiring and to comply with the Code.
Integral parts of Equipment are not covered in this code. Where a manufacturer has defective or wrong parts, you may file a field complaint with the listing lab against the manufacturer.
Please advise if we can install them. The product instructions provided in the catalogue sheets are contrary to the listing of the product use, and shall comply with subsection I am designing a high-rise residential building fed via a 7-wire residential distribution system where a common neutral conductor is shared between three apartments and tapped to feed each Apartment Panel with a full sized neutral.
It seems that since all six phases are present that the neutral would only be carrying the imbalance from the three phase circuit and therefore not be included. As a note when the neutral is tapped to feed each individual apartment panel we are considering it a CCC as per Neutral conductor is not considered a current carrying conductor in your proposed installation.
Rouging is to be retrofitted in to existing concrete slab. Fortunately we had an inspector on site and he told us that this installation will never pass according to his interpretation of the NEC section This is what it says: Section As stated in these paragraphs Paragraph 5 : Where the cable has and outer jacket of PVC, in any nonresidential building unless concealed within non-plenum walls, floors and ceilings where the walls, floors and ceilings provide a thermal barrier of material that has at least a 1 hour rated assembly as identified in listings of fire rated assemblies.
Is use of MC cable with outer PVC jacket permitted in concrete slabs of a multi dwelling building over 3 stories, provided cable does not extend beyond concrete slab? Yes, with concrete cover that provides 1-hour fire rating. Interpretation is valid. The V conductors will be entering an existing raceway system that leaves the service room. Two of the second level switches are fed from one 1st level A SSW, and the other is fed from another A service takeoff in the room.
See image. Are barriers necessary? We researched previous interpretations and found one in that stated After the second device there are no issues, which in our case all feeders running in same enclosures are downstream of second level devices. Yes, barriers are required in accordance with The electrical switchgear room is located on the ground floor, in a flood plain area.
The electric service room is being designed to be water-tight, with ship's doors. Must the electrical equipment end service box, service switches, current transformers, meters, switchgear, transformers, panels be installed at a level above the flood plain? If so, how high above the flood plain?
The building is new construction and will include an outpatient surgical suite, an imaging suite, a primary care suite and several medical offices. Per Building Code, Appendix G Please note that the use of ship's doors may not allow access to the main service room where flood water hasn't receded.
In addition, such door shall comply with egress and be provided with panic hardware. The line side is fed with 4 THHN fused at 70 amps. These conductors enter a trough and are then tapped with 2 sets of 6 conductors; each set goes to the line side of a 60 amp main breaker of a branch circuit panel.
The total length of the conductors, including the smaller tapped conductors, from the load side of the transformer to the line side of the main breaker of the branch circuit panel is less than 10'. Does this conform with the feeder and transformer sections of the code? The described feeder tap is actually a feeder double taps and is not considered to be protected.
If so can the ground conductor from the transformer to each panel main be sized for the main breaker of the branch circuit panel?
See subsection If yes What would suffice as a direct ground e. Can you cite where I can find it? Separately Derived System such as transformer shall be grounded in accordance with section We believe that section Not handholes or junction boxes. Please confirm. We see that section Please confirm this is sufficient for junction boxes and handhole boxes. If not, please provide code reference for any other requirement. NYC EC subsection However, there was no real connection between what was happening on stage and on screen.
It often came off as disjointed instead. It seemed at some points that Mary Shelley may have been talking to a descendant of hers, since the same actress was on stage and on screen, and so looked the same with a few differences in hairstyle. However, no explanations or tie-ins between the two were ever given, so one can only wonder. Overall, AMP is a very well-researched, well-written and well-executed, and certainly educational play about a fascinating accomplished young woman and her family.
In fact, for this piece, Christopherson received a New York Society Library grant, for emerging female writers writing about history and literature. The Other Mozart is astounding from start to finish, with one actor, one set and a trove of history and humor that tells the story of Nannerl Mozart, the oft-forgotten elder sister of world-famous composer Wolfgang Amadeus Mozart.
0コメント